Permanent claim record · Sofia → Belgrade (train)
Active closure
Verified\u00b7 2026-07-01 | Predicate | route.segment |
| Subject | Sofia → Belgrade (train) (route) |
| Item | Niš–Dimitrovgrad reconstruction — 2023 |
| As of | 2026-07-01 |
| Status | Verified |
| Source | Stroom Travel 2026 Re-Check Sweep — Perplexity Deep Research (A1–A5) (trust 6.5/10) |
| Reference | — |
| Document hash | pending evidence-pack link |
| Provenance chain | perplexity_deep_research |
| Claim ID | 152847ee-f309-4a8c-a2cd-d40ffe7f457a |
Raw value (vault-stripped)
{"item":"nis_dimitrovgrad_reconstruction_2023","as_of":"2026-07-01","label":"Niš–Dimitrovgrad reconstruction — 2023","detail":"Nov 2023: Serbia began full reconstruction/modernization of Nis-Dimitrovgrad line; all passenger trains on section cancelled until further notice — the structural cause of the 2026 gap.","report":"A3","confidence":"T2","source_url":"https://trenopedia.com/train-between-belgrade-and-sofia/","status_2026":"active_closure"}