Permanent claim record · Bangkok → Siem Reap (train)
Ban klong luk border
Verified\u00b7 2026-07-01 | Predicate | route.segment |
| Subject | Bangkok → Siem Reap (train) (route) |
| Item | Thai rail terminal — since 2019 |
| As of | 2026-07-01 |
| Status | Verified |
| Source | Stroom Travel 2026 Re-Check Sweep — Perplexity Deep Research (A1–A5) (trust 6.5/10) |
| Reference | — |
| Document hash | pending evidence-pack link |
| Provenance chain | perplexity_deep_research |
| Claim ID | 73b853bd-472b-475a-8787-2040a67341c0 |
Raw value (vault-stripped)
{"item":"thai_rail_terminal_evolution","as_of":"2026-07-01","label":"Thai rail terminal — since 2019","detail":"Since Jul 2019 SRT terminal is Ban Klong Luk Border station (at the crossing), replacing Aranyaprathet 6km short — the 2013-era tuk-tuk gap eliminated when open.","report":"A2","confidence":"T2","source_url":"https://aworldtolive.com/bangkok-to-cambodia-by-train/","status_2026":"ban_klong_luk_border"}